24/7 EMERGENCY DISPATCH Heavy equipment breakdown or structural emergency? Call (800) 555-IRON
← Back to RederSoft Designs
PROJECT SHOWCASE

COMPLETED BUILDS & TRANSFORMATIONS

Interact with our live Before & After site comparison slider below to inspect structural transformations from raw groundbreak to finished commissioning.

INTERACTIVE BEFORE / AFTER SLIDER

O'Hare Logistics Hub — 220,000 Sq Ft Transformation

DRAG SLIDER HORIZONTALLY ↔
// SITE STATUS: MARCH 2024

RAW EXCAVATION & PILINGS

Over 45,000 cubic yards of subgrade soil stabilization, retention walls, and 180 deep caissons drilled into bedrock.

// COMPLETED: NOVEMBER 2025

COMMISSIONED LOGISTICS TERMINAL

Fully operational 48-dock distribution facility with solar array roof, ESFR sprinkler system, and heavy-duty concrete apron.

↔

Recent Major Projects

HEAVY INDUSTRIAL

Apex Aerospace Turbine Plant

140,000 sq ft manufacturing hangar with 50-ton overhead gantry cranes and isolated foundation pads.

$38.4M · COMPLETED ON SCHEDULE
CIVIL INFRASTRUCTURE

Midwest Intermodal Rail Terminal

Heavy-load paving for dual 10,000-ft rail siding, switch houses, and storm surge retention basins.

$24.2M · ZERO SAFETY INCIDENTS
COMMERCIAL COLD STORAGE

NorthStar Refrigerated Distribution

-20°F deep freeze facility with sub-slab heated ventilation, insulated panel envelope, and automated racking.

$45.1M · LEED GOLD CERTIFIED