PROJECT SHOWCASE
COMPLETED BUILDS & TRANSFORMATIONS
Interact with our live Before & After site comparison slider below to inspect structural transformations from raw groundbreak to finished commissioning.
INTERACTIVE BEFORE / AFTER SLIDER
O'Hare Logistics Hub — 220,000 Sq Ft Transformation
DRAG SLIDER HORIZONTALLY ↔
Recent Major Projects
HEAVY INDUSTRIAL
Apex Aerospace Turbine Plant
140,000 sq ft manufacturing hangar with 50-ton overhead gantry cranes and isolated foundation pads.
$38.4M · COMPLETED ON SCHEDULE
CIVIL INFRASTRUCTURE
Midwest Intermodal Rail Terminal
Heavy-load paving for dual 10,000-ft rail siding, switch houses, and storm surge retention basins.
$24.2M · ZERO SAFETY INCIDENTS
COMMERCIAL COLD STORAGE
NorthStar Refrigerated Distribution
-20°F deep freeze facility with sub-slab heated ventilation, insulated panel envelope, and automated racking.
$45.1M · LEED GOLD CERTIFIED